April 11, 2022
Green Cities Foundation - Hamilton build Phase 3
June 6-11, 2022 | Donations of labour, equipment, materials and funds accepted
The week of June 6-11, 2022 we are looking for labour, including equipment (excavator, loader, compactor, auger).
June 6-10: Complete children’s playground (woodwork, pavers, planting).
June 11: Community Day (planting, clean-up, mulching)
June 11: Community Day (planting, clean-up, mulching)
Peter Guinane, Project Manager, has also put together a list of materials we are looking for to complete the project this year. Major items include:
- Services and drains: Catch basin, drain pipe, sleeves for services.
- Grading and sandbox materials: Filter fabric, crushed gravel, play sand, tarp cover.
- Fencing, arbour, pergola, gates and sandbox: 6x6 PT posts, 4x4 PT posts, 2x4 PT posts, 1x6 cedar, sono tube, concrete.
- Precast pavers and sensory pathways: Pave edge, HPB - fine grading, pavers, polymeric joining sand, step stones.
- Log bench and steps: Stumps/logs.
- Play mulch surfaces: Landscape fabric, fibar play mulch.
- Planting: Soil, Myke (or other).
- Irrigation: Irrigation controller, rain sensor, pipe, heads, electrical outlet, hose bib.
Financial donations are also accepted via: https://interland3.
Anyone interested in helping out can contact Rebecca Doutre at 647-724-8532 or email gcfdirector@gcfoundation.ca.
FINANCIAL DONATIONS
Phase 4 will include the parking lot and front area landscaping, with an aim to complete the project in October, 2022.